§ 54-517. Machinery and equipment.  


Latest version.
  • In Zones A, A1 through A30, AE, V1 through V30, or VE as designated on the adopted Flood Insurance Rate Maps (FIRM), and in Community Flood Hazard Areas (CFHA), New Construction and Substantial Improvements shall be constructed with all attendant electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities either:

    (1)

    designed and constructed to be elevated to or above the Base Flood Elevation (B.F.E.) subject to the requirements found in Section 54-516; or

    (2)

    designed and/or located to prevent Flood water from entering or accumulating within their components during conditions of Flooding.

(Ord. No. 2002-013, § 2, 4-24-2002; Ord. No. 2003-085, § 7, 10-8-2003; Ord. No. 2008-084, § 7, 7-8-2008; Ord. No. 2009-024, § 8, 9-22-2009; Ord. No. 2009-060, § 5, 4-14-2010; Ord. No. 2016-043, § 3, 9-7-2016)